Common modelling mistakes
The errors that cost the most time are rarely dramatic. They are small and repeated.
Five to look for
Rooms without numbers. Doors hosted to the wrong wall. Duplicate types with one letter changed. Levels copied instead of shared. Sheets with no revision.
Fix the source
Each of these has a cause upstream. Fix the template and the mistake stops appearing in new projects.



