Tarnwick Locks Eleven narrow locks · Tarnwick Canal

Folio 08

Moorings

Six stretches of bank, measured in metres from the Basin entrance. Four take boats overnight.

Plan

Plan: 6 moorings along the flight, measured from the Basin entrance1234567891011M1M2M3M4M5M60 m2600 m
Locks numbered above the line, moorings below. Not to scale across the canal.

Six moorings

Every mooring takes boats up to 21.3 m, the longest the flight takes.

Moorings
MooringBetweenFrom–to mBank mWaterStay
M1 Basin pontoonsBelow Lock 120–260240Yes2 nights
M2 Wharf lay-byLocks 1 to 2380–42040No2 h, waiting only
M3 Engine Lock landingLocks 4 to 5880–91535No2 h, waiting only
M4 Long PoundLocks 6 to 71230–1490260Yes2 nights
M5 Toll House lay-byLocks 9 to 101885–193550No1 night
M6 Hollin PoundAbove Lock 112200–2560360Yes3 nights

Notes

M1 Basin pontoons
Pontoons. Water point and refuse at the east end
M2 Wharf lay-by
Towpath side. Waiting for Lock 2 only, 2 h
M3 Engine Lock landing
Towpath side. Waiting for Lock 5 only, 2 h
M4 Long Pound
Towpath side. Water point at the Lock 7 end
M5 Toll House lay-by
Offside side. Bollards, no rings
M6 Hollin Pound
Towpath side. Water point, refuse and rubbish bins by the bridge