Folio 08
Moorings
Six stretches of bank, measured in metres from the Basin entrance. Four take boats overnight.
Plan
Six moorings
Every mooring takes boats up to 21.3 m, the longest the flight takes.
| Mooring | Between | From–to m | Bank m | Water | Stay |
|---|---|---|---|---|---|
| M1 Basin pontoons | Below Lock 1 | 20–260 | 240 | Yes | 2 nights |
| M2 Wharf lay-by | Locks 1 to 2 | 380–420 | 40 | No | 2 h, waiting only |
| M3 Engine Lock landing | Locks 4 to 5 | 880–915 | 35 | No | 2 h, waiting only |
| M4 Long Pound | Locks 6 to 7 | 1230–1490 | 260 | Yes | 2 nights |
| M5 Toll House lay-by | Locks 9 to 10 | 1885–1935 | 50 | No | 1 night |
| M6 Hollin Pound | Above Lock 11 | 2200–2560 | 360 | Yes | 3 nights |
Notes
- M1 Basin pontoons
- Pontoons. Water point and refuse at the east end
- M2 Wharf lay-by
- Towpath side. Waiting for Lock 2 only, 2 h
- M3 Engine Lock landing
- Towpath side. Waiting for Lock 5 only, 2 h
- M4 Long Pound
- Towpath side. Water point at the Lock 7 end
- M5 Toll House lay-by
- Offside side. Bollards, no rings
- M6 Hollin Pound
- Towpath side. Water point, refuse and rubbish bins by the bridge